Rio Salado College Communiversity at Queen Creek
BID DATE
11/6/12 - 2:30 REAL-TIME
AGENCY
Maricopa Community College District
ESTIMATE
$4,625,000
SCOPE
Work consists of the construction of a new 21,813 gsf two-story classroom, community room, student services and office building. Concrete slab on grade, steel structure, coated urethane foam and raised seam metal roofing. Interior finishes include carpet tile, wood paneling, ceramic tile, acoustic lay-in ceiling. Community room includes an operable partition. Construction includes typical mechanical, plumbing and electrical systems. Mechanical system is package and split system roof mounted HVAC units. Electrical site includes grading, asphalt paving, landscaping, concrete sidewalks and curbs, site lighting sewer and water line extensions, and electrical/cable/telecom conduit additions for local utility services. A two year warranty is required for the Work. Each bid shall be in accordance with the specifications issued by the MCCCD. The project is estimated between $4,500,000 and $4,750,000. Bid documents are available for a $100.00 per set (check or money order only) refundable deposit payable to (Maricopa County Community College District or M.C.C.C.D). There is a limit of two (2) sets of documents per General Contractor and one (1) set per Subcontractor/supplier. Deposits for drawings and specifications not returned within 30 days from the bid date shall be forfeited. If General contractors or subcontractors wish to obtain a CD/ROM in place of hard copy paper drawings and specifications, a CD will be available for a $15 per CD non-refundable payment. Techniprint will nee

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT