Access the Full Project by Clicking here!
Bidjugde
JOB
Guys Schulmeyer Gulch Bridges
BID DATE
05/23/17 - 10:00
AGENCY
Siskiyou County
ESTIMATE
$1,700,000
SCOPE
Guys Gulch (Schedule A) (Road): Work includes the reconstruction of approx. 0.35 miles of roadway by making major changes in the alignment. Clearing and grubbing is to be performed, minor cuts are to be made and fills constructed. Existing surfacing is to be pulverized, material from the existing roadway is to be excavated and utilized in the reconstruction. Aggregate base will be placed on the newly constructed grade and overlaid with hot mix asphalt. Existing culverts are to be removed, new culverts placed, and drainage ditches constructed. Driveway connections are to be constructed and paved, portions of existing fences will be removed, and new fences constructed. Work will include other items or details not mentioned above as required by the plans and specifications. Guys Gulch Bridge (Schedule B): Work includes the construction of a cast in place reinforced concrete slab bridge (approx. 35ft. 10in. long by 33ft. 4in. wide) on concrete abutments and driven precast concrete piles. The existing reinforced concrete triple box culvert will be removed, clearing and grubbing is to be performed, portions of existing fences are to be removed and new fence constructed, approach roadways are to be constructed, and other items or details not mentioned above as required by the plans and specifications. Schulmeyer Creek Bridge (Schedule C):Work includes the construction of a cast in place, reinforced concrete slab bridge (approx. 35ft. 10in. long by 33ft. 4in. wide), on concrete abutments and driven precast concrete piles. The existing reinforced concrete triple box culvert will be removed, detour constructed, approach roadway widened, rock slope protection placed, and other items or details not mentioned above as required by the plans and specifications.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT