Water Sewer Group 1011 Water Group 969
BID DATE
05/25/17 - 2:00
AGENCY
San Diego
ESTIMATE
$11,470,000
SCOPE
Sewer & Water Group 1011: The work is proposed to be replaced-in-place using the open trench construction method within the City right-of-way. The water footage consists of approximately 23,272 LF (4.41 miles) of existing 8-inch to 16-inch prioritized AC water mains to be replaced with 23,272 (4.41 miles) of 8-inch to 16-inch PVC pipe. The Sewer Footage consists of approximately 1,565 LF of existing 8-inch prioritized AC sewer mains to be replaced with 1,566 LF (0.30 miles) of 8-inch PVC pipe. The work includes associated water services, fire hydrants, curb ramps, traffic control, etc.There will also be 4 re plumb for nearby residences needed to maintain the integrity of the pipe system Michelle Muñoz - 619-533-3482 MichelleM@sandiego.gov