Access the Full Project by Clicking here!
Bidjugde
JOB
2016 17 Annual Citywide Sewer Rehab
BID DATE
05/25/17 - 2:00
AGENCY
Encinitas
ESTIMATE
$1,690,000
SCOPE
Cardiff Sanitary Division - Lining approximately 18,000 linear feet of sewer pipe ranging from 6-inch to 14-inch diameter with cured-in-place pipe (CIPP), excavation and replacement of approximately 321 linear feet of 8-inch sewer pipe within the same trench from manhole to manhole, 3 point repairs of sewer pipe by CIPP lining, 7 point repairs of sewer pipe by excavation, rehabilitation of 8 service lateral connections, and rehabilitation of 17 manholes.Encinitas Sanitary Division - Lining approximately 10,400 linear feet of sewer pipe ranging from 6-inch to 14-inch diameter with cured-in-place pipe (CIPP), excavation and replacement of approximately 120 linear feet of 8-inch sewer pipe within the same trench from manhole to manhole, 1 point repair of sewer pipe by excavation, rehabilitation of 8 service lateral connections, rehabilitation of one service lateral pipe, and rehabilitation of 3 manholes. Kipp Hefner - 760-633-2775 khefner@encinitasca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT