Marana Road Realignment Capital Improvement
BID DATE
05/22/17 - 4:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
BID DATE CHANGED. This project entails the construction of a new 2-lane alignment of Marana road from Sanders to Sandario roads. The new alignment will begin approximately 1000 feet east of Sanders road and proceed through an agricultural field to the tie-in with Sandario road, located approximately 950 feet south of the current Marana road and Sandario intersection. The new alignment will be constructed with a structural section that includes a 6 thick cement treated base (6% cement) atop scarified and re-compacted subbase material. A new drainage channel will be constructed on the southern side of the alignment, which includes drainage weirs, dry wells and rip rap slope protection. Rudy Torres (520) 382-1983 rtorres@maranaaz.gov