Wet Weather Equalization Basin
BID DATE
04/27/17 - 2:00
AGENCY
Pacifica
ESTIMATE
$15,500,000
SCOPE
In general, the project comprises constructing a 2.1-million-gallon wet weather equalization (EQ) basin, two diversion structures to passively divert flows from the existing Linda Mar Boulevard and Arguello Boulevard sanitary sewer lines and transport the flow along approximately 1,520 lineal feet (LF) of new gravity sewer conveyance piping installed by open trench, 160 LF of new gravity sewer conveyance piping installed by bore and jack methods, and 575 LF of new force main sewer conveyance pipeline to the existing Crespi sanitary sewer line. The project also consists of constructing the ancillary equipment associated with the EQ basin including a motor control center (MCC) building, a ventilation and odor-control system, and a potable-water-supplied cleaning system within the EQ basin. sunl@ci.pacifica.ca.us