SCOPE
Furnish and install by horizontal direction drilling (HDD) methods approximately 580 linear feet of 8-inch fusible high density polyethylene pipe (HDPE). Furnish and install by open trench methods approximately 500 linear feet of 8-inch polyvinyl chloride (PVC) pipe. The project also includes the abandonment of existing 8-inch asbestos cement pipe. The project is located on private property and in private streets in a residential area, all with restricted access, and requires traffic control, utility protection, and public outreach. Graham Jordan - 760-602-2462 graham.jordan@carlsbadca.gov