Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2016 2017 Pavement Maintenance
BID DATE
05/9/17 - 2:00
AGENCY
Larkspur
ESTIMATE
n/a
SCOPE
The work generally consists of sawcutting, cold planing, removing and disposing of asphalt roadway section; quicklime/cement soil treatment of subsurface materials; placement of hot mix asphalt (HMA) pavement materials; PCC improvements including construction of curb ramps, sidewalk, and curb and gutter; raising and lowering utility covers; setup and maintenance of traffic control system; developing and implementing a water pollution control program; replacement of traffic striping and markings; cleanup of the project area; and other items of work as shown on the plans. atan@cityoflarkspur.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT