Access the Full Project by Clicking here!
Bidjugde
JOB
SMETC Channel Drain Rehabilitation
BID DATE
05/11/17 - 2:00
AGENCY
San Marcos
ESTIMATE
$65,000
SCOPE
The work generally consists of demolition of an existing concrete slab and upper-section of a channel drain concrete encasement, construction of reinforced concrete grade beams (inclusive of slip dowels), salvage and replacement of existing grates and metal channel and all other work required by the contract documents to completely rehabilitate the concrete adjacent to the existing channel drain. All work shall take place starting June 11, 2017 through July 3, 2017. Contractor will have full access to the site during this period.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT