Access the Full Project by Clicking here!
Bidjugde
JOB
CWTP Water Supply Rehabilitation
BID DATE
05/17/17 - 2:00
AGENCY
Sacramento
ESTIMATE
$562,000
SCOPE
This project creates a new potable fire supply loop for the Citys Combined Wastewater Treatment Plant (Facility) using a portion of the existing non-potable supply piping, and by adding new piping that connects to the Citys potable water distribution system. The existing non-potable system that remains will also be modified to meet existing irrigation and sedimentation basin wash down needs for the Facility. The work includes, but is not limited to furnishing and installing approximately 950 linear feet of water pipeline, one hydropneumatic tank, one water booster pump, three hydrants, electrical wiring and monitoring equipment; removal of three existing line shaft turbine well pumps and installation of three new 25 horsepower submersible well pumps; demo of existing and construction of new wellheads and discharge piping, new well column piping, instrumentation, and performing well casing videos; pavement restoration; recycling construction debris; site cleanup; and construction of all the associated appurtenances as shown on the Plans and/or as indicated in these Contract Documents. Furnish and install all material, labor, tools, equipment, and services necessary for a complete, in-place operating system. Mark Elliott - 916-808-8894 MElliott@cityofsacramento.org
PREBID
5/3/2017 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT