Access the Full Project by Clicking here!
Bidjugde
JOB
Gas Compressor Bldg Piping Replacement
BID DATE
04/18/17 - 11:00
AGENCY
Orange County SD
ESTIMATE
$1,462,000
SCOPE
1. Remove existing pipe and valves that are being replaced with new pipe and valves. 2. Install all required piping, fittings, equipment, and electrical work as shown and specified in the Contract Documents. 3. Provide instrumentation to monitor gas content of methane, nitrogen, and oxygen. 4. Pressure test installed gas piping and valves. 5. Coordinate gas compressor start up with OCSD Operations. 6. Remove existing fan and duct work that are being replaced. 7. Install new fan, duct work, and fan controls. 8. Test fan and duct work. 9. Provide and install hot-taps, tees, valves, hoses, and piping for temporary bypass piping in gas compressor building, utility tunnel, and on gas compressor roof. 10. Restore any damages on the existing facilities. 11. Site cleanup and demobilization. 12. Remove all temporary facilities and equipment including bypass piping and used carbon canisters from OCSD properties. Jay Kaura, Contracts Administrator via electronic telecommunication (email) at construction@ocsd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT