Access the Full Project by Clicking here!
Bidjugde
JOB
Well 19 Replacement
BID DATE
05/16/17 - 2:00
AGENCY
Dona Ana County
ESTIMATE
n/a
SCOPE
The Well 19 Replacement Project includes demolition of existing Well 19 facilities, a new water production well to replace Well 19, well pump and discharge piping, well control building, disinfection system, electrical and instrumentation, site piping, grading, plugging and abandonment of the existing Well 19. The following items will be included for the Project: 1. Mobilization/Demobilization/Project Administration 2. Drilling replacement Well 19 3. Providing and installing the new well pump for replacement Well 19 4. New well control building for replacement Well 19 5. Discharge piping, valves, flow meter, in replacement Well 19 control building 6. Gas chlorination system for replacement Well 19 7. Replacement Well 19 electrical and instrumentation systems 8. HVAC system for replacement Well 19 control building 9. Site fencing, grading, surfacing, and blow-off pond for replacement Well 19 10. Site Piping for replacement Well 19 11. Plugging and abandonment of former Well 19 12. Demolition of existing Well 19 facilities 13. Stormwater Pollution Prevention Plan (SWPPP)

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT