Access the Full Project by Clicking here!
Bidjugde
JOB
AC Water Group 1018A
BID DATE
05/2/17 - 2:00
AGENCY
San Diego
ESTIMATE
$5,590,000
SCOPE
AC Water Group 1018A consists of installation of 18,490 Linear Feet (LF) or (3.5 miles) miles of 8, 12-inch PVC (Polyvinyl Chloride) water main pipes, to replace the existing 6, 8-inch AC (Asbestos Concrete). All pipe, 18,490 LF is replace in place. Related work for re installation of fire hydrants, services, curb ramps, and other appurtenances, including street repair and/or resurfacing. Juan Espindola - 619-533-4491 jeespindola@sandiego.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT