North Avenue Reconstruction Frankwood Ave
BID DATE
04/27/17 - 3:00
AGENCY
Reedley
ESTIMATE
n/a
SCOPE
The work includes, in general, Base Bid – includes roadway excavation, installation of curb, gutter, sidewalk, ADA compliant ramps, alley drive approaches, signage and striping. Schedule A – includes demolition, disposal and abandonment of existing 10-inch asbestos cement water lines and installation of a 10-inch C900 water main, fire hydrant and water services and appurtenances. Schedule B – includes removal and disposal of existing 8-inch clay sewer main, installation of 8-inch SDR-35 sewer main and epoxy existing sewer manholes. The time to complete the work is before the expiration of Fifty (50) CONSECUTIVE CALENDAR DAYS beginning on the day specified in the Notice to Proceed. salina.gonzalez@reedley.ca.gov