Access the Full Project by Clicking here!
Bidjugde
JOB
Harvard Avenue Roadway Streetscape Rehabilitation
BID DATE
05/11/17 - 10:00
AGENCY
Irvine
ESTIMATE
$1,000,000
SCOPE
The work to be performed shall include, but not be limited to:Removing and disposing Stone Pine trees, including all surface tree roots to a minimumdepth of 6 inches in the turf areas; planting Afghan Pine trees; installing root barriers;removing and replacing damaged concrete sidewalk, curb and gutter; modifying noncompliantcurb ramps; cold milling AC pavement; AC pavement surface course overlay;and other items not mentioned here, but are required by the Special Provisions. Brian D. Brown, CPSM bbrown@cityofirvine.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT