Access the Full Project by Clicking here!
Bidjugde
JOB
2016 17 Pavement Rehabilitation
BID DATE
05/3/17 - 2:00
AGENCY
Danville
ESTIMATE
$5,590,134
SCOPE
The 2016/17 Pavement Rehabilitation Project generally includes, but is not limited to, preparatory tree trimming, removal and replacement of existing Portland Cement Concrete curb, sidewalk, curb ramp, and valley gutter, installing PCC swale, subdrain installation, removal and replacement of existing asphalt concrete pavement (dig-outs), pavement cold planning, installation of paving mat, installation of asphalt concrete overlay, removal and replacement of asphalt concrete speed lumps/bumps, removal and replacement of new traffic signal loop detectors, adjusting to grade of survey monument castings, water valve castings, storm drain and sanitary sewer manhole covers, and other utility lids, removal and replacement of existing pavement striping and markers and traffic control for various streets in Danville, California.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT