Access the Full Project by Clicking here!
Bidjugde
JOB
2017 Pavement Overlay
BID DATE
04/20/17 - 2:00
AGENCY
Moraga
ESTIMATE
$585,098
SCOPE
mobilization; traffic control and construction signage; water pollution control; clearing and grubbing including pruning and tree removal; traffic striping, traffic markings, and markers removal; removal and replacement of concrete curb, gutter and sidewalk, and construction of concrete curb ramps; full depth asphalt base repairs, conform and wedge grinding, rubberized hot mix asphalt (RHMA) overlay; adjusting of utility features (e.g. water valve boxes, sanitary and storm drain manhole frame and covers); edge drain (Additive Alternate #3); placement of thermoplastic traffic stripes, pavement markers, and thermoplastic pavement markings; and all other work as shown on the Plans and as described in the Caltrans Standard Specifications and the Special Provisions to provide a complete project in Moraga, California. publicworks@moraga.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT