Access the Full Project by Clicking here!
Bidjugde
JOB
Boys Ranch Well 2A Jackson 3 Well Pump Stations
BID DATE
04/20/17 - 2:30
AGENCY
Morgan Hill
ESTIMATE
$1,300,000
SCOPE
The Project sites are located at the following locations: • The Boys Ranch #2, 2A, and 3 well sites are located near the Anderson Lake Visitor Center at the intersection of the Coyote Creek Trail head and the northern extension of Malaguerra Avenue. • Jackson #1 and 3: well sites are located at 2150 E. Dunne Avenue, east of the Hill Rd./E. Dunne Ave. intersection. The Project’s Scope of Work is described as follows: • Furnishing all materials, labor, equipment, fuel, tools, and transportation required to: o Abandon a total of three (3) existing wells; Boys Ranch #2, Boys Ranch #3, and Jackson sites; o Install new water pipelines and one (1) 125-hp (horsepower) vertical turbine lineshaft well pump to an existing well at the Boys Ranch #2 well site and all related site work from the Boys Ranch #2A well site to the existing Boys Ranch #2 pump station; o Install new water pipelines and one (1) 100-hp vertical turbine lineshaft well pump to an existing well at the Jackson well; and related site work from the Jackson #3 well site to the existing Jackson #1 pump station; o Complete all work related to the above items as shown on the Plans and as detailed in these Specifications. Kat.Corrales@morganhill.ca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT