Access the Full Project by Clicking here!
Bidjugde
JOB
Chino 5 MG Tank (REBID)
BID DATE
04/24/17 - 2:00
AGENCY
Prescott
ESTIMATE
n/a
SCOPE
ORG BID RESULTS: Paso Robles Tank, Inc. - $3,478,267 Fann Contracting - $3,580,949 Currier Construction Inc. - $3,810,135 This project will construct a hew 5 million gallon welded steel water tank. The new tank wi1 reflect the nominal dimensions and exact base elevation of the current tank located at the Citys Water Production Facility in the Town of Chino Valley and will be located to the east of the exiting tank. The proposed tank location will require grading & engineered fill work for the tank pad as well as piping to connect the tank to the existing system. It is also anticipated that the existing CMU block wall will be extended to the east, some minor landscape work will be done, and site security will be incorporated into the new tank design.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT