Access the Full Project by Clicking here!
Bidjugde
JOB
Carlson Crosstown Connection
BID DATE
05/25/17 - 2:00
AGENCY
Richmond
ESTIMATE
$1,000,000
SCOPE
In general, the work consists of roadway striping and signage, sidewalk and curb ramp improvements, pedestrian crossing upgrades, installing traffic signal cameras and installing bus shelters; and for all other work, items, or details note mentioned above that are required by the Drawings, Standard Specifications, of these Special Provisions. Tawfic N. Halaby (510)621-1612 tawfic_halaby@ci.richmond.ca.us
PREBID
4/11/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT