Access the Full Project by Clicking here!
Bidjugde
JOB
Dredging Lagoon Intake Structure
BID DATE
03/30/17 - 2:00
AGENCY
Foster City
ESTIMATE
n/a
SCOPE
The water level in the Foster City Lagoon is regulated by allowing water in through the intake structure by Sea Cloud Park and pumping water out into the San Francisco Bay, by the Citys Corporation Yard. Over the years, sedimentation has built-up on the Belmont Slough side of the intake structure, resulting in limited water flow into the lagoon. The sedimentation in front of the lagoon intake structure impedes water from flowing into the lagoon except during periods of high tides. In addition, at times, sediment also blocks the Bay Level Transducer, producing inaccurate water level readings. The key objectives of the project include the following: Restoring the west intake structure to its original, intended function of transmitting water from the Belmont Slough into the lagoon; and Safely and efficiently removing and disposing of sediment material currently obstructing the west intake structure.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT