Summit Drive Culvert Repair
BID DATE
04/27/17 - 2:00
AGENCY
Burlingame
ESTIMATE
$130,000
SCOPE
The project consists of potholing existing utilities at least three weeks prior to mobilizing to site, temporary bypass of stream flows, new curb inlet, excavation, removal of portions of existing corrugated metal pipe (CMP), installation of new storm drain culvert and a new storm drain line, cast-in-place concrete transition collar with sealing gasket, thrust blocks, temporary caps and blowoff, ductile iron potable water pipe, ductile iron fittings, dechlorination of potable water, disinfection of potable water pipe and fittings, repaving of trenches in areas shown on the project drawings, hydroseeding and revegetation. The Engineer’s Estimate for the work is $130,000.