Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Sewer Lift Station Rehabilitation Alameda
BID DATE
06/27/17 - 5:00
AGENCY
Tempe
ESTIMATE
$4,000,000
SCOPE
A phased rehabilitation program for the City of Tempe Sanitary Sewer Lift Stations is planned over the next approximately 4 year period in which up to $4,000,000 in construction costs will be spent. A variety of rehabilitation methods will be utilized on the aging lift stations and multiple contracts may be awarded within the overall program. The first phase of work under this rehabilitation program is the Alameda Lift Station. It will involve the removal of an existing package duplex pump system (600 GPM) and the installation of a new modern package duplex pump system (350 GPM) with new subsurface piping and appurtenances and maintenance access ways. Conceptual 30% construction drawings are available for download which include typical bypass pumping and pedestrian traffic closure schemes.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT