Access the Full Project by Clicking here!
Bidjugde
JOB
Gateway Treatment Facility Expansion
BID DATE
05/10/17 - 3:00
AGENCY
Avondale
ESTIMATE
n/a
SCOPE
The Project consists of construction of a new water treatment facility at the Gateway site that includes an Ion Exchange (IX) system and supporting equipment, valves and piping (brine maker, air blowers etc.), GAC treatment vessel and media, backwash tank, spent brine holding tanks, site work, soils excavation and backfill, site roads, piping, site perimeter walls, concrete foundations and slabs, miscellaneous steel structures, lift station pumps, electrical wiring, conduit and control panels, site lighting, PLC and HMI system, and programming.
PREBID
4/5/2017 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT