Bushmaster Park Booster Pump Station
BID DATE
04/13/17 - 3:00
AGENCY
Flagstaff
ESTIMATE
n/a
SCOPE
he Project consists of installing an inline booster pump station to pump reclaimed water from the Wildcat Hill Wastewater Treatment Plant Wildcat up to Buffalo Tank and shall consist of the following major construction items:1. Packaged Booster Pump Station consisting of the following• 2 Pumps, station will have a 3rd pump expansion ability• Booster Pump Station Skid• 12 Suction Header• 10 Discharge Header2. Bushmaster Park BPS Special Provisions• Gate Valves (4 – 12 in size)• 3 pressure reducing valve (PRV)• 4 Surge Anticipator Valve (SAV)• 8 MAG Meter• Misc. Materials & appurtenances3. 12” Reclaim Waterline4. Building for Pump Station5. Electrical Improvements Patrick Brown, C.P.M. - 928-213-2277 pbrown@flagstaffaz.gov