Verde Valley School Road Shoulder Widening & Pavement Rehab
BID DATE
08/30/12 - 2:00 REAL-TIME
AGENCY
Yavapai County
ESTIMATE
$936,000
SCOPE
The scope of work includes furnishing all labor, materials, equipment, fixtures and services required for this project and is generally divided into two segments: SEGMENT-1 is approximately 3500 linear feet and consists of a pavement widening from 26 feet to 30 feet, and a 2” Asphaltic Concrete overlay; SEGMENT-2 is approximately 3600 linear feet and consists of a Full Depth Reclamation (FDR – 9” deep), a roadway widening from 26 feet to 32 feet, utilization of 5” of the FDR material to be used as base course, and installation of 4” of new asphaltic concrete pavement. Excess FDR materials shall be used in the embankment construction. Additionally, a minimal amount of imported material for embankment will also be required. This project also includes existing driveway and side street matchups, new aggregate base shoulders, restoration of current roadway striping, and drainage improvements which entail some existing pipe extensions and headwall installations. Total estimated quantity of asphaltic concrete placement is approximately 4,800 tons.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT