Access the Full Project by Clicking here!
Bidjugde
JOB
Reconstruction Dove Toki Roads
BID DATE
04/13/17 - 2:00
AGENCY
GRIC
ESTIMATE
n/a
SCOPE
The project will consist of reconstructing a 1 mile segment of Toki Road between Blackwater School Road and Dove Road and a 1 mile segment of Dove Road between Toki road and Skousen Road. Currently the roads are in poor condition and vary in width from 24 feet to 28 feet. The purpose of the project is to improve and widen the roadway to 34 feet by milling and replacing the pavement, as well as, re-grading the shoulders to help promote drainage after heavy rainfall events. The scope of work consists of: ï‚· Sawcut the existing asphalt 1-2 feet inside of the existing pavement edge. ï‚· Remove and dispose of the existing asphalt separated by the sawcut. ï‚· Remove the existing shoulder material to a depth of 9 inches at the sawcut edge and transport the excavated material to storage site 1-2 miles from the work zone. ï‚· Re-grade the shoulders to form a ditch and transport the excavated material to storage site 1-2 miles from the work zone. ï‚· Install 6 inches of AB material to build up the shoulders. ï‚· Mill out the remaining 24 foot width of asphalt pavement over the entire length of the project and transport the millings to a storage site 1-2 miles from the work zone. ï‚· Scarify and re-compact the existing AB material that was under the milled asphalt. ï‚· Re-pave with 3 inches of asphalt to a new 34 foot pavement width. Valerie Bustos valerie.bustos@gric.nsn.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT