Access the Full Project by Clicking here!
Bidjugde
JOB
2017 Annual and Measure J L Pavement Rehabilitation
BID DATE
04/4/17 - 2:00
AGENCY
Orinda
ESTIMATE
n/a
SCOPE
Project No. 4114 work to be done generally consists of pavement rehabilitation on one Collector Road with a slurry seal and rehabilitation of two School Route streets with FDR; Project No. 4115 work to be done generally consists of the rehabilitation of 60 Residential roads with FDR, and will also include replacement of curbs, gutters, concrete or asphalt-lined swales, and asphalt dikes; construction of a curb ramp; appurtenant striping, utility, and monument cover adjustments; and storm drain pipes within the paving limits using both trenchless technology and open trench replacement. Farah Khorashadi at 925-253-4282 or fkhorashadi@cityoforinda.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT