Access the Full Project by Clicking here!
Bidjugde
JOB
Camino Alto Pump Station Improvements
BID DATE
04/4/17 - 2:00
AGENCY
Mill Valley
ESTIMATE
$1,380,000
SCOPE
The proposed scope of work includes, but is not limited to rehabilitation of the Camino Alto Pump Station including required demolition of the existing Camino pump station, generator and controls, modifications to the existing subsurface concrete structure, including construction of a valve pit, flow meter pit, 14 OD HDPE force main, 18 OD HDPE gravity sewer, 16 PVC gravity sewer, 15 CIPP liner, five (5) ft diameter PVC-lined influent manhole, installation of a new motor control center and all electrical work, installation of a sound-attenuated 80 kW engine generator, all surface improvements, site improvements, landscaping, irrigation, drainage improvements, site fencing, pavement restoration, temporary controls, bypass pumping and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT