Access the Full Project by Clicking here!
Bidjugde
JOB
Water Infrastructure Improvements
BID DATE
03/31/17 - 12:00
AGENCY
Tombstone
ESTIMATE
$674,000
SCOPE
The Project work includes, but is not limited to the (1) relocation of water treatment plant site tank inlet piping, installation of water quality analysis equipment, electrical and controls, sampling locations, and new meters (2), approximately 300 lf of bypass piping at surface water reservoir, pressure relief valve, electrical and controls, demolition and construction of new reservoir roof, installation of new HDPE lining of existing reservoir (3) magnetic flow meter, electrical and controls, and office central SCADA system at Well No. 1, (4) installation of new pre-packaged VFD booster station with piping manifold and bladder tank, re-equip existing Well No. 2, magnetic flow meter, and electrical and controls. dmiller@westlandresources.com echristenson@westlandresources.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT