Access the Full Project by Clicking here!
Bidjugde
JOB
Ryan Road Alignment Utilities Irrigation
BID DATE
04/5/17 - 3:00 LIVE!
AGENCY
Queen Creek
ESTIMATE
n/a
SCOPE
CHANGED TO LIVE. Major elements of the Phase I and Phase II projects include furnishing all labor, tools, materials, equipment and any other incidentals necessary to construct the 24 inch PVC sewer line at depths up to 23 feet; polymer manholes, crossing of operational and non-operational utilities and irrigation facilities; removal of existing irrigation ditch and pipe; removal and replacement of other known above ground concrete pads and electrical/mechanical equipment; removal of chain link and other metal fencing; compaction of backfill materials; testing of improvements; and clean up and replacement of utility easements and temporary construction easements to pre-construction grades and conditions. The project will be required to be constructed beneath a 4 inch natural gas main that must be kept live throughout the construction process. The contractor is responsible for all permits and approvals necessary for the means and methods used to cross the 4 inch natural gas line. Town will provide to the Contractor all C-909 pipe (not including fittings or appurtenances) for the potable water line option. melissa.bauer@queencreek.org
PREBID
3/21/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT