Eastmark Phase I Civil and Landscape Roadway Improvements
BID DATE
08/22/12 - 2:00 LIVE!
AGENCY
City of Mesa
ESTIMATE
n/a
SCOPE
a. Ray Road Improvements (CP0165) – consists of approximately two miles of half street improvements (ultimately three lanes each direction with a landscaped median) in Phase 1. The improvements include potable water, storm drain system, box culverts, dry utilities, concrete curb, gutter and sidewalk, paving, striping, signage, street lights, traffic signal conduit systems in preparation for traffic signals at three internal locations (Inspirian Parkway, Eastmark Parkway, and Everton Terrace), street sleeves, landscaping and irrigation. b. Inspirian Parkway (CP0166) - consists of approximately 800 feet of full street improvements (two lanes each direction divided minor arterial with median) including potable water, storm drain system, dry utilities, concrete curb, gutter and sidewalk, paving, striping, signage, street lights, street sleeves, landscaping and irrigation. c. Eastmark Parkway (CP0167) - consists of about one-third mile of full street improvements (two lanes each direction divided minor arterial with median) including sewer, well water, non-potable water, potable water, storm drain system, dry utilities, curb, gutter and sidewalk, paving, striping, signage, street lights, street sleeves, landscaping and irrigation. d. Signal Butte Road (CP0168) - consists of about one-half mile of construction for half street improvements (two lanes one direction with a middle turning lane in lieu of a median), including well water, potable water, storm drain system, dry utili

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT