Mill Valley Sausalito Multi Use Pathway Resurfacing
BID DATE
04/6/17 - 2:30
AGENCY
Marin County
ESTIMATE
$210,000
SCOPE
This project consists of widening the existing multi-use pathway from approximately 8 feet wide to 10 feet wide, including 2 foot wide shoulders on each side. Construction methods include pulverizing the existing pathway, incorporating cement, placing and compacting to create base material. An asphalt concrete overlay will be placed on top of the cured material and 2 foot shoulders on each side will be placed with quarry fine material. Shoulder backing with the same material will be necessary. The project limits are along the Mill Valley – Sausalito Multi-Use Pathway corridor between East Blithdale Avenue and Vasco Court, approximately 3,500 feet long. Ali Iqbal aiqbal@marincounty.org