FY 2015 2016 Street Resurfacing Pacific Avenue
BID DATE
03/30/17 - 2:00
AGENCY
Stockton
ESTIMATE
n/a
SCOPE
Pacific Avenue from Rivara Road to March Lane and Thornton Road from El Camino Avenue to Rivara Road). The scope of work includes base failure repairs, pavement patching/leveling, pavement grinding (cold plaining), installing electrical traffic detector loops and detector hand holes, 1.5 and 3 asphalt concrete overlay, re-striping, extruded curbs, stamped concrete in median islands, ADA wheel ramps, truncated domes, two bus pads at BRT stops, removal and re-installation of curb, gutter and sidewalk. Project Manager Thinh Phan (209) 937-8885 Thinh.Phan@stocktonca.gov Plan Holder List Miguel Mendoza (209) 937-7446 Miguel.Mendoza@stocktonca.gov