Access the Full Project by Clicking here!
Bidjugde
JOB
Interstate 5 Freeway Widening Water Main Relocation Florence Avenue Segment Phase II
BID DATE
03/21/17 - 11:00
AGENCY
Santa Fe Springs
ESTIMATE
$660,000
SCOPE
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans and Specifications. The general items of work include but may not be limited to removal and disposal of interfering portions of existing 8 water main, furnishing and installing 8 ductile iron pipe via trenching, along with all shoring required, furnish and install 8 DIP with 16 steel casing at designated locations per plans. Included in this Project is all trenching, trenching shoring, and furnishing and installing fittings, valves, blow off assemblies, all appurtenances, and all pipe pressure testing and disinfection within the project area. Noe Negrete City of Santa Fe Springs Public Works 11710 Telegraph Rd Santa Fe Springs, CA 906703658 Tel:(562) 868-0511 Fax:(562) 409-7651 publicworks@santafesprings.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT