Access the Full Project by Clicking here!
Bidjugde
JOB
Paloma Road Sewer Main Rehabilitation
BID DATE
03/23/17 - 3:00
AGENCY
East Valley WD
ESTIMATE
n/a
SCOPE
This project is located on Paloma Road, between Del Rosa Avenue and Golondrina Drive, in the City of Highland, California. Paloma Road is a residential street with a 40 right-of-way and 24 wide asphalt. The total length of this 8 CIPP lining project is 680 lf., with the 50-year-old, 8 VCP pipe, spanning between three brick manholes. Each span is approximately 340 lf. This section of sewer serves 21, four inch residential laterals. Approximately 22 single family homes lie upstream of the project location. It is the responsibility of the contractor to determine how diversion of this flow is accomplished during the course of his work. The rehabilitation of the pipe by the CIPP method and the reinstatement of the sewer laterals shall be accomplished according to the attached specifications. CIPP work shall be performed by a licensed contractor according to the attached specifications. Cleaning and CCTV of the sewer main is the responsibility of the contractor and shall be performed according to the attached specification and to the satisfaction of the engineer. All permits are the responsibility of contractor. Traffic control and customer notification plans must be approved by the Engineer and/or the City before work can begin.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT