St Augustine Storm Drain Improvement (REBID)
BID DATE
06/15/17 - 2:00
AGENCY
Benicia
ESTIMATE
n/a
SCOPE
ORG BID RESULTS: Trinet Construction - $530,620 Pfister Excavating - $1,249,155 The scope of work generally includes storm drainage improvements within the public right-of-way and other drainage easement areas within portions of private parcels of a residential community. Items of work include removal and replacement of existing pavement, curb, sidewalk and concrete surfaces. Other site facilities for removal and reconstruction include wood fences, stone walkways, and grass turf areas. Storm drainage improvements include small and large diameter pipelines up to 48-inch diameter equivalent pipe-arch, inlet structures, manholes, and concrete headwalls/trash rack. Temporary facilities for construction operations may include construction surveys, traffic control, utility coordination, protection and potholes, trench shoring and structure protections, dewatering, displacement monitoring, and conformance with erosion control, water quality, and dust control requirements Steven Yee, P.E. Principal Civil Engineer (interim) 250 East L Street Benicia, CA 94510 707-746-4240 (phone) syee@ci.benicia.ca.us (email)

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT