Access the Full Project by Clicking here!
Bidjugde
JOB
Citywide ADA Ramps Street Reconstruction Phase 4
BID DATE
03/14/17 - 2:00
AGENCY
Monterey
ESTIMATE
$1,200,000
SCOPE
In general, the work consists of, but is not limited to, the demolition and construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach) and curb ramps, storm drainage, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction and Hot Mix Asphalt pavement. Rose Dickson City of Monterey Public Works/Engineering 353 Camino El Estero Monterey, CA 93940 Tel:(831) 646-3997 Fax:(831) 646-5686 dickson@monterey.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT