Access the Full Project by Clicking here!
Bidjugde
JOB
Elsworth Street Alessandro Blvd Intersection Improvement
BID DATE
03/27/17 - 5:00
AGENCY
Moreno Valley
ESTIMATE
$709,000
SCOPE
Removing existing steep cross gutters across Elsworth Street on the northern and southern sides of the intersection;• Installing storm drain systems including two new catch basins and reinforced concrete pipes (RCP);• Relocating 12-in and 30-in Eastern Municipal Water District water lines;• Cutting and removing interfering abandoned utility pipes and filling with slurry cap (5-feet minimum);• Reconstructing four concrete access ramps at four corners to Americans with Disability Act (ADA) standards and installing detectable warning surfaces at designated locations;• Grinding and Overlaying of asphalt concrete;• Converting traffic signal to mast arm and replacing vehicular head;• Implementing Advanced Dilemma Zone protection; and• Installing traffic striping, pavement markers, and markings. Rene Herbert - 951-413-3155 reneh@moval.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT