Morristown-New River Hwy (STP-074-A(202)T)
BID DATE
07/27/12 - 11:00 LIVE!
AGENCY
ADOT
ESTIMATE
$9,000,000
SCOPE
The proposed work is located on SR 74 in Maricopa County, beginning at US 60 Milepost 0.09 and extending easterly to Milepost 22.42 for a distance of approximately 22.33 miles. The project is located east of Wickenburg between US 60 and Picacho Wash Trail. The project consists of milling the existing deteriorated pavement and replacing it with Asphaltic Concrete (3/4" Mix) (End Product) (Special Mix), new Asphalt Rubber-Asphaltic Concrete Friction Course (AR-ACFC) and Asphaltic Concrete (Misc.Structural). The project also includes temporary striping and new permanent striping, traffic control and other related work.