Access the Full Project by Clicking here!
Bidjugde
JOB
American Avenue Disposal Site Modules 7 8 Excavation
BID DATE
03/9/17 - 2:00
AGENCY
Fresno County
ESTIMATE
$7,163,425
SCOPE
The work to be done consists, in general, of the excavation of Modules 7 & 8, installation of a composite liner system consisting of geosynthestics over a geosynthetic clay liner, and the performance of a geoelectric leak detection survey. It also includes but is not limited to the installation of Modules 7 & 8 sump liner system, riser pipes, clean out pipes, leachate meter runs and all miscellaneous work associated with the installation of these items. Clearing and grubbing is to be performed and the project site is to be finished. Other items or details not mentioned herein that are required by the plans, Standard Specifications or these special provisions shall be performed, constructed, furnished or installed.
PREBID
2/22/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT