Access the Full Project by Clicking here!
Bidjugde
JOB
Fontana Grade Crossings Pedestrian Improvement
BID DATE
03/22/17 - 2:00
AGENCY
San Bernardino
ESTIMATE
n/a
SCOPE
The Fontana Grade Crossings Pedestrian Improvement Project was initiated to construct grade crossing safety enhancements for pedestrians at the existing Sierra Avenue and Juniper Avenue Metrolink at-grade crossings in the City of Fontana. The Sierra Avenue and Juniper Avenue at-grade crossings currenUy book-end the Fontana Metrolink Station and the Omnitrans Transfer Center, and improvements at both crossings will help provide a safe pedestrian route to these transit connection points. Work will include constructing sidewalk, curb, and gutter on both sides of Sierra Avenue at the Metrolink at-grade crossing and Juniper Avenue at the Metrolink at-grade crossing, within the existing SBCTA right-of-way; and install signage, stripping, and channelization at both at-grade crossings. Contractor to coordinate with Other Details Metrolink, which will be constructing signals, gates, and trackwork at the same time at both crossings. Alicia Johnson 909-884-8276 ajohnson@gosbcta.com
PREBID
2/16/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT