Access the Full Project by Clicking here!
Bidjugde
JOB
2017 ARHM Overlay Slurry Seal Designated Streets
BID DATE
03/16/17 - 2:00
AGENCY
El Centro
ESTIMATE
n/a
SCOPE
The work shall include grinding of existing asphalt concrete pavement, crack cleaning and filling, installation of gap graded asphalt-rubber hot mix, slurry seal, replacement of Concrete ADA ramps/curb and gutter/sidewalk, retrofitting existing ADA Ramps, replacement of traffic loops, Asphalt Concrete dig-outs, traffic striping and raised pavement markers, utility adjustments, erosion control and traffic control.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT