Access the Full Project by Clicking here!
Bidjugde
JOB
Le Conte Safe Routes to School
BID DATE
03/7/17 - 2:00
AGENCY
Berkeley
ESTIMATE
$419,000
SCOPE
Scope of Work: The work to be done consists of sidewalk and roadway improvements at three different intersections along Shattuck Avenue within the City of Berkeley. See location map and plans. The work consists of constructing new sidewalk bulbouts, new concrete sidewalk, storm drain drainage modifications, traffic striping, traffic pavement markings, disabled access ramps, and traffic control. This work includes, but is not limited to, the removal of existing conditions, saw-cutting, removal of existing pavement, curb, gutter, and sidewalk, as required, cleaning of street as necessary, adjusting to grade such City structures as are affected by the work Bidders are responsible for notifying Donald Irby, P.E., via email at DIrby@CityofBerkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT