Access the Full Project by Clicking here!
Bidjugde
JOB
Water Conservation Program Implementation Package No 2 (REBID)
BID DATE
03/13/17 - 3:00
AGENCY
Lake Havasu
ESTIMATE
$1,278,914
SCOPE
ORG BID RESULTS> https://bidjudge.com/results.php?job_id=9287 This project consists of converting the irrigation water source at various locations along Arizona Highway 95 and at Cypress Park, Jack Hardie Park, and the ASU Campus from potable water to reclaimed water. This will involve disconnecting the landscape irrigation connections along the highway, the parks, and ASU campus irrigation systems from potable water service and reconnecting them to reclaimed water lines. The project includes the installation of approximately 1,260 linear feet of 4-inch DR 18 PVC, approximately 1,140 linear feet of 4-inch Schedule 80 PVC, and approximately 670 linear feet of 2-inch Schedule 80 PVC, associated tapping saddles, gate valves, fittings and appurtenances, and landscaping and surface replacement for areas disturbed by the work, and associated electrical and instrumentation. The project also includes installation of new motorized valves in valve vaults at the intersection of Smoketree and Arizona Highway 95, a new motorized valve in valve vault at Oak Drive south of the existing reclaimed water connection, modifications to an existing lift station, including a new hydropneumatic tank and associated appurtenances at the Mulberry Wastewater Treatment Plant, and a packaged reuse booster pump station at the Island Wastewater Treatment Plant.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT