JOB
Campo Road Sewer Replacement
BID DATE
03/9/17 - 5:00 LIVE!
AGENCY
Otay WD
ESTIMATE
$7,200,000
SCOPE
The general scope of work includes the construction of approximately 7,575 feet of 8-inch and 15-inch gravity sewer pipe, jack and bore of approximately 426 feet of 30 steel casing pipe and approximately 505 feet of 16 FPVC carrier pipe, open trench installation of approximately 147 feet of 30 PVC casing and 154 feet of 16 FPVC carrier pipe, abandonment of 11,657 feet of existing 8-inch and 10-inch sewer pipe, installation of 26 new manholes, reconnection of sewer lines and laterals, 8-inch waterline relocation, 36-inch RCP storm drain diversion, maintaining sewer service, restoration of pavement and striping, landscaping, replacement of concrete improvements, removal of trees, traffic control, erosion control, protection of existing utilities, testing and inspection and all other work and appurtenances in accordance with the Contract Documents.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT