Shaw Ave Pavement Overlay Blythe Brawley
BID DATE
02/21/17 - 3:00
AGENCY
Fresno
ESTIMATE
$295,310
SCOPE
The scope of work includes, but is not limited to asphalt concrete grinding and overlaying along east bound of W. Shaw Avenue, from Blythe to Brawley Avenues. The work consists of 0.2 deep perimeters conform and full 0.2 minimum grind, and then applying 0.2 thick asphalt concrete overlay. In addition, non-conforming curb ramps will be re-constructed, affected signal loop detectors will be replaced and pavement will be re-striped within the project boundary. Diana Reynolds - 559-621-1151 Diana.Reynolds@Fresno.gov