Access the Full Project by Clicking here!
Bidjugde
JOB
Slope Restoration Wildwood Creek at Wildwood Canyon Road
BID DATE
02/1/17 - 3:00
AGENCY
Yucaipa
ESTIMATE
$74,000
SCOPE
he project will consist of placing soil material, generated from the project site, along with rock slope protection along approximately 350-lineal foot section of Wildwood Creek where prior flood events have eroded the bank of the streambed causing the adjacent Wildwood Canyon Road to be in danger of being undermined and/or washed out. The project site is adjacent to the south side of Wildwood Canyon Road and the soil material and rock slope protection will be placed along the northern embankment of Wildwood Creek, where the active channel is closest to the road, There is currently about 377 feet of K-rail along the northern bank of the creek that was placed as an interim emergency measure after a significant rain event in 2014. Mike Seal City Of Yucaipa 34272 Yucaipa Blvd Yucaipa, CA 92399 Tel:(909) 797-2489 x252 Fax:(909) 790-9203 mseal@yucaipa.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT