Access the Full Project by Clicking here!
Bidjugde
JOB
Driftwood Drive Path
BID DATE
01/26/17 - 2:00
AGENCY
Suisun City
ESTIMATE
$500,000
SCOPE
The project will construct a 10-foot wide concrete Class I bikeway along the south side of Driftwood Drive between Marina Boulevard and Josiah Circle fronting Crystal Middle School. The project will also include removing existing sidewalk, curb ramps, chain link fence, storm drain inlet, road signs, asphalt concrete, tree stumps, and trees; striping, and pavement markings; upgrading curb ramps to ADA-compliant curb ramps; relocating street lights; installing curbs & gutters, street lights, chain link fence, and chain link gates; irrigation/landscaping; striping, pavement markings, and signs; and modifying existing irrigation/turf areas on school grounds.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT