Access the Full Project by Clicking here!
Bidjugde
JOB
2016 2017 Minor Streets Maintenance Phase I
BID DATE
01/19/17 - 2:00
AGENCY
Riverside
ESTIMATE
$2,089,790
SCOPE
The project entails maintenance improvements on various minor streets and alleyways throughout the City of Riverside. This project generally includes, but is not limited to, the reconstruction of asphalt pavement, ARAM pavement treatments, concrete sidewalks, driveways, pedestrian ramps, cross gutters, curb, and gutter; adjustment of water meters boxes, water valve covers, and sewer, storm drain, and electric manholes; removal and replacement of traffic striping; and installation of signs. The project also includes construction of a pedestrian ramp and reconstruction of asphalt pavement at La Cadena Drive, Columbia Avenue, and reconstruction of pavement on Madison Street and Magnolia Ave. thuang@riversideca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT